Batch Scheduling with Proportional-Linear Deterioration and Outsourcing

Joint Authors

Miao, Cuixia
Zou, Juan
Meng, Fanxiao
Jia, Binglin

Source

Mathematical Problems in Engineering

Issue

Vol. 2017, Issue 2017 (31 Dec. 2017), pp.1-5, 5 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2017-06-22

Country of Publication

Egypt

No. of Pages

5

Main Subjects

Civil Engineering

Abstract EN

We consider the bounded parallel-batch scheduling with proportional-linear deterioration and outsourcing, in which the actual processing time is pj=αj(A+Dt) or pj=αjt.

A job is either accepted and processed in batches on a single machine by manufactures themselves or outsourced to the third party with a certain penalty having to be paid.

The objective is to minimize the maximum completion time of the accepted jobs and the total penalty of the outsourced jobs.

For the pj=αj(A+Dt) model, when all the jobs are released at time zero, we show that the problem is NP-hard and present a pseudo-polynomial time algorithm, respectively.

For the pj=αjt model, when the jobs have distinct m (

American Psychological Association (APA)

Miao, Cuixia& Meng, Fanxiao& Zou, Juan& Jia, Binglin. 2017. Batch Scheduling with Proportional-Linear Deterioration and Outsourcing. Mathematical Problems in Engineering،Vol. 2017, no. 2017, pp.1-5.
https://search.emarefa.net/detail/BIM-1191234

Modern Language Association (MLA)

Miao, Cuixia…[et al.]. Batch Scheduling with Proportional-Linear Deterioration and Outsourcing. Mathematical Problems in Engineering No. 2017 (2017), pp.1-5.
https://search.emarefa.net/detail/BIM-1191234

American Medical Association (AMA)

Miao, Cuixia& Meng, Fanxiao& Zou, Juan& Jia, Binglin. Batch Scheduling with Proportional-Linear Deterioration and Outsourcing. Mathematical Problems in Engineering. 2017. Vol. 2017, no. 2017, pp.1-5.
https://search.emarefa.net/detail/BIM-1191234

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1191234