Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm

Joint Authors

Lu, Yinan
Lin, Xin

Source

Mathematical Problems in Engineering

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-7, 7 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-07-15

Country of Publication

Egypt

No. of Pages

7

Main Subjects

Civil Engineering

Abstract EN

In view of the poor performance of the original mathematical model of assembly construction project precost budget, a mathematical model of assembly construction project precost budget based on improved neural network algorithm is proposed.

This paper investigates the cost content of assembly construction project and analyzes its early cost.

It finds that the early cost of assembly construction project includes component production cost, transportation component cost, and installation component cost.

Based on the improved neural network algorithm to build an improved neural network model, the improved neural network model to mine the cost data in the early stage of assembly construction project is used.

In this paper, the earned value variable is introduced to transform the project duration and project cost in the early stage of the prefabricated construction project into quantifiable cost data, and the earned value analysis method is used to estimate the implementation cost of the prefabricated construction project.

According to the result of cost estimation, the mathematical model of precost budget of prefabricated construction project is built based on the project parameters.

In order to prove that the cost budget performance of the mathematical model based on the improved neural network algorithm in the early stage of assembly construction project is better, the original mathematical model is compared with the mathematical model, the experimental results show that the cost budget performance of the model is better than the original model, and the cost budget performance is improved.

American Psychological Association (APA)

Lin, Xin& Lu, Yinan. 2020. Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-7.
https://search.emarefa.net/detail/BIM-1194563

Modern Language Association (MLA)

Lin, Xin& Lu, Yinan. Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm. Mathematical Problems in Engineering No. 2020 (2020), pp.1-7.
https://search.emarefa.net/detail/BIM-1194563

American Medical Association (AMA)

Lin, Xin& Lu, Yinan. Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-7.
https://search.emarefa.net/detail/BIM-1194563

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1194563