Group Scheduling Problems with Time-Dependent and Position-Dependent DeJong’s Learning Effect

Joint Authors

Huo, Jiazhen
Sun, Li
Ning, Lei

Source

Mathematical Problems in Engineering

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-8, 8 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-02-17

Country of Publication

Egypt

No. of Pages

8

Main Subjects

Civil Engineering

Abstract EN

In this paper, we introduce a group scheduling model with time-dependent and position-dependent DeJong’s learning effect.

The objectives of scheduling problems are to minimize makespan, the total completion time, and the total weighted completion time, respectively.

We show that the problems remain solvable in polynomial time under the proposed model.

American Psychological Association (APA)

Sun, Li& Ning, Lei& Huo, Jiazhen. 2020. Group Scheduling Problems with Time-Dependent and Position-Dependent DeJong’s Learning Effect. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-8.
https://search.emarefa.net/detail/BIM-1195720

Modern Language Association (MLA)

Sun, Li…[et al.]. Group Scheduling Problems with Time-Dependent and Position-Dependent DeJong’s Learning Effect. Mathematical Problems in Engineering No. 2020 (2020), pp.1-8.
https://search.emarefa.net/detail/BIM-1195720

American Medical Association (AMA)

Sun, Li& Ning, Lei& Huo, Jiazhen. Group Scheduling Problems with Time-Dependent and Position-Dependent DeJong’s Learning Effect. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-8.
https://search.emarefa.net/detail/BIM-1195720

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1195720