A Two-Stage Scheduling RPC Based on Time-Varying Coefficient Information of State-Dependent ARX Model

Joint Authors

Zhou, Feng
Zhu, Peidong
Xie, Minghua
Wu, Jun
Cao, Lihua

Source

Mathematical Problems in Engineering

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-15, 15 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-03-07

Country of Publication

Egypt

No. of Pages

15

Main Subjects

Civil Engineering

Abstract EN

A two-stage scheduling robust predictive control (RPC) algorithm, which is based on the time-varying coefficient information of the state-dependent ARX (SD-ARX) model, is designed for the output tracking control of a class of nonlinear systems.

First, by using the parameter variation range information of the SD-ARX, a strategy for constructing the system’s polytopic model is designed.

To further reduce the conservativeness of the convex polytopic sets which are designed to wrap the system’s future dynamics, the variation range information of the SD-ARX model’s parameters is also considered and compressed.

In this method, the polytopic state-space model of the system is constructed directly based on the special structure of the SD-ARX model itself, and there is no need to make such assumption that the bounds on the parameter’s variation range in the system model are known or measurable.

And then, a two-stage scheduling RPC algorithm is designed for the output tracking control.

A numerical example is presented to demonstrate the effectiveness of the proposed RPC strategy.

American Psychological Association (APA)

Zhou, Feng& Zhu, Peidong& Xie, Minghua& Wu, Jun& Cao, Lihua. 2020. A Two-Stage Scheduling RPC Based on Time-Varying Coefficient Information of State-Dependent ARX Model. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-15.
https://search.emarefa.net/detail/BIM-1195868

Modern Language Association (MLA)

Zhou, Feng…[et al.]. A Two-Stage Scheduling RPC Based on Time-Varying Coefficient Information of State-Dependent ARX Model. Mathematical Problems in Engineering No. 2020 (2020), pp.1-15.
https://search.emarefa.net/detail/BIM-1195868

American Medical Association (AMA)

Zhou, Feng& Zhu, Peidong& Xie, Minghua& Wu, Jun& Cao, Lihua. A Two-Stage Scheduling RPC Based on Time-Varying Coefficient Information of State-Dependent ARX Model. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-15.
https://search.emarefa.net/detail/BIM-1195868

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1195868