Horizontal Well Completion with Multiple Artificial Bottom Holes Improves Production Performance in Bottom Water Reservoir

Joint Authors

Wang, Haidong
Liu, Yikun

Source

Mathematical Problems in Engineering

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-11, 11 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-07-24

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Civil Engineering

Abstract EN

The horizontal well completion with stinger is usually used to control the bottom water cone.

Although the pressure profile and the inflow profile along the horizontal wellbore can be divided into two parts by the stinger, these profiles have not really flattened.

In order to flatten the pressure distribution and inflow distribution further, it proposes a new technology.

This new horizontal well has multiple artificial bottom holes (MABH) along the wellbore and it has application potential.

In order to verify the effectiveness of MABH technology, a model of horizontal well completion with MABH was established, and the production performance of different water cone control technologies was analyzed: conventional horizontal well, stinger completion horizontal well, and MABH completion horizontal well.

The results show that the MABH technology has more advantages than the stinger technology.

The uniformity of pressure distribution of the 6-MABH horizontal well is 55% higher than that of the horizontal well with string technology, and the uniformity of inflow distribution is increased by 65.25%.

At the same time, although the operation of MABH technology is very simple, it should follow a rule of MABH installation: the position of the first MABH should be set at 242.5 m from the heel hole of the horizontal wellbore, and the other interval is 92.4 m.

American Psychological Association (APA)

Wang, Haidong& Liu, Yikun. 2020. Horizontal Well Completion with Multiple Artificial Bottom Holes Improves Production Performance in Bottom Water Reservoir. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1197809

Modern Language Association (MLA)

Wang, Haidong& Liu, Yikun. Horizontal Well Completion with Multiple Artificial Bottom Holes Improves Production Performance in Bottom Water Reservoir. Mathematical Problems in Engineering No. 2020 (2020), pp.1-11.
https://search.emarefa.net/detail/BIM-1197809

American Medical Association (AMA)

Wang, Haidong& Liu, Yikun. Horizontal Well Completion with Multiple Artificial Bottom Holes Improves Production Performance in Bottom Water Reservoir. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1197809

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1197809