Hierarchical Production Planning and Real-Time Control for Parallel Batch Machines in a Flow Shop with Incompatible Jobs

Joint Authors

Huang, JinDian
Liu, JianJun

Source

Mathematical Problems in Engineering

Issue

Vol. 2018, Issue 2018 (31 Dec. 2018), pp.1-12, 12 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2018-12-30

Country of Publication

Egypt

No. of Pages

12

Main Subjects

Civil Engineering

Abstract EN

Effective control of the heat-treatment operation is essential to reducing manufacturing cost in mould manufacturing.

The heat-treatment shop floor is a flow shop with parallel batch processors and incompatible jobs.

The jobs differ from each other in product types, sizes, release times, and due-dates.

The scheduling objective is to minimize manufacturing cost, including energy cost, subcontracting cost, and jobs’ tardiness penalties cost.

A hierarchical production planning structure is proposed, which contains three decision-making levels: (1) balancing capacity and demand, (2) machining at the quenching stage, and (3) machining at the tempering stage.

At the first level, the periodic rolling scheduling heuristic is proposed for the purpose of balancing the capacity and the demand in the coming period in the heat-treatment shop floor.

At the second and third levels, two new look-ahead batching heuristics are proposed.

An extensive computational experiment is conducted to verify the effectiveness of the proposed heuristics.

American Psychological Association (APA)

Huang, JinDian& Liu, JianJun. 2018. Hierarchical Production Planning and Real-Time Control for Parallel Batch Machines in a Flow Shop with Incompatible Jobs. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-12.
https://search.emarefa.net/detail/BIM-1208782

Modern Language Association (MLA)

Huang, JinDian& Liu, JianJun. Hierarchical Production Planning and Real-Time Control for Parallel Batch Machines in a Flow Shop with Incompatible Jobs. Mathematical Problems in Engineering No. 2018 (2018), pp.1-12.
https://search.emarefa.net/detail/BIM-1208782

American Medical Association (AMA)

Huang, JinDian& Liu, JianJun. Hierarchical Production Planning and Real-Time Control for Parallel Batch Machines in a Flow Shop with Incompatible Jobs. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-12.
https://search.emarefa.net/detail/BIM-1208782

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1208782