Mathematical Analysis and an Exact Solution Combined with Preprocessing Method for Resynchronizing of Bus Timetable Problem

Joint Authors

Wu, Yinghui
Zhu, Yifan
Cao, Tianyu

Source

Mathematical Problems in Engineering

Issue

Vol. 2018, Issue 2018 (31 Dec. 2018), pp.1-10, 10 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2018-09-23

Country of Publication

Egypt

No. of Pages

10

Main Subjects

Civil Engineering

Abstract EN

Bus timetabling is a subproblem of bus network planning, and it determines departure time of each trip of lines to make vehicles from different lines synchronously arrive at transfer stations.

Due to the well-designed coordination of bus timetables, passengers can make a smooth transfer without waiting a long time for connecting buses.

This paper addresses the planning level of resynchronizing of bus timetable problem allowing modifications to initial timetable.

Timetable modifications consist of shifts in the departure times and headways.

A single-objective mixed-integer programming model is proposed for this problem to maximize the number of total transferring passengers benefiting from smooth transfers.

We analyze the mathematical properties of this model, and then a preprocessing method is designed to reduce the solution space of the proposed model.

The numerical results show that the reduced model is effectively solved by branch and bound algorithm, and the preprocessing method has the potential to be applied for large-scale bus networks.

American Psychological Association (APA)

Wu, Yinghui& Zhu, Yifan& Cao, Tianyu. 2018. Mathematical Analysis and an Exact Solution Combined with Preprocessing Method for Resynchronizing of Bus Timetable Problem. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-10.
https://search.emarefa.net/detail/BIM-1209009

Modern Language Association (MLA)

Wu, Yinghui…[et al.]. Mathematical Analysis and an Exact Solution Combined with Preprocessing Method for Resynchronizing of Bus Timetable Problem. Mathematical Problems in Engineering No. 2018 (2018), pp.1-10.
https://search.emarefa.net/detail/BIM-1209009

American Medical Association (AMA)

Wu, Yinghui& Zhu, Yifan& Cao, Tianyu. Mathematical Analysis and an Exact Solution Combined with Preprocessing Method for Resynchronizing of Bus Timetable Problem. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-10.
https://search.emarefa.net/detail/BIM-1209009

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1209009