Problems and obstacles which constrain the optimal construction site management into Libyan large-scale projects

Other Title(s)

المشاكل و العقبات التي تقيد الإدارة المثلى للمواقع الإنشائية في المشاريع الليبية واسعة النطاق

Joint Authors

Stephenson, Paul
al-Zughbi, Muhammad Qasim
al-Qurqab, Lutfi Umar

Source

مجلة جامعة سبها للعلوم البحتة و التطبيقية

Publisher

Sabha University

Publication Date

2018-03-31

Country of Publication

Libya

No. of Pages

10

Main Subjects

Civil Engineering

English Abstract

The management of the construction site (CSM) includes a combination of a number of activities that can reflect the project in its final form and directly influences security, material supply, resource utilisation, health and safety, planning, cost and all other aspects of construction that permeate the implementation of the project.

Practically, it is not a simple procedure to manage a site successfully.

Construction work has become a complex set of processes, and there are numerous management challenges which are continually occurring on construction sites.

Hence the importance of this paper, which aims to study "problems and obstacles which constrain the optimal management of the construction site, as well as to identify approaches and methods that can be used to address these difficulties and obstacles and solve these problems”.This study adopted a mixed approach that included many research activities, including an in-depth review of the relevant literature to explore the most important problems facing CSM and the possible solutions used in previous studies.

In the context of the on-site study, a qualitative approach, including field visits and semi-structured interviews, was used within five large-scale projects suggested by organisations which have worked on behalf of GMRWUA in Libya.

This was followed by an assessment of the CSM Problems in terms of their importance and frequency of occurrence, through the use of the quantitative approach (questionnaire).The main findings of the paper focus on the identification and classification of the problems of the CSM in terms of their effect on managing construction sites, and their frequency of occurrence.

In addition, the problem-solving approaches to be taken by the CSM team were identified in the GMRWUA Projects, which can help in mitigating the CSM problems in future.

Data Type

Conference Papers

Record ID

BIM-1213495

American Psychological Association (APA)

al-Zughbi, Muhammad Qasim& al-Qurqab, Lutfi Umar& Stephenson, Paul. 2018-03-31. Problems and obstacles which constrain the optimal construction site management into Libyan large-scale projects. . Vol. 17, no. 1 (2018), pp.417-426.Sabha Murzuq : Sabha University.
https://search.emarefa.net/detail/BIM-1213495

Modern Language Association (MLA)

al-Qurqab, Lutfi Umar…[et al.]. Problems and obstacles which constrain the optimal construction site management into Libyan large-scale projects. . Sabha Murzuq : Sabha University. 2018-03-31.
https://search.emarefa.net/detail/BIM-1213495

American Medical Association (AMA)

al-Zughbi, Muhammad Qasim& al-Qurqab, Lutfi Umar& Stephenson, Paul. Problems and obstacles which constrain the optimal construction site management into Libyan large-scale projects. .
https://search.emarefa.net/detail/BIM-1213495