آثار الفايروسات المعدية على العقود المدنية : فايروس كوفيد-19 أنموذجا-كورونا

Other Title(s)

The effects of infectious viruses on civil contracts : Covid-19 model-corona

Joint Authors

الحنكاوي، أحمد عبد الله
الزبيدي، محمد صديق محمد عبد الله

Source

مجلة كلية القانون للعلوم القانونية و السياسية : مجلة علمية محكمة

Publisher

University of Kirkuk College of Law and Political Sciences

Publication Date

2020-02-28

Country of Publication

Iraq

No. of Pages

20

Main Subjects

Law

English Abstract

There is no configuration if each contractor had committed to fulfilling his rights and the obligations and there is and no emergency has occurred that Interrupt the optimal implementation of the contract, but the actual fact arises after some viruses have had a severe impact on life in general and on contracts in particular, including Covid-19 virus.

Its impact reached to be considering as a global threat, which led to issues raised due to how to implement the held contracts and the losses from this pandemic that struck most countries of the world, including the most economically stronger countries in the world.

Among the people of the research problems is an explanation of the impact of these viruses in general and the Covid-19 virus in particular on how the legal adaptation of contracts, which we have noticed because it probability between the majeure force and emergency circumstances, with demands for new regulations in particular to serve the situations the world is going through as a result of the impossibility or difficulty of implementation.

Implementation is sometimes can be possible.

By abolition what has been previously explained, we conclude that there are contracts that have not been permanently affected by the measures taken by the countries to confront the Corona virus and limit its spread, and there is another type of contract that has been affected to the point that the commitment has become impossible to implement and here we apply the majeure force theory, there is a third type of contracts that which it is impossible to implementing the obligations, but has become cumbersome; hence, we applied the theory of emergency circumstances.

Accordingly, in all cases, the legal characterization of each incident is subject to the discretion of the judge, and if the judge considers that there is an impossibility in implementation in light of the precautionary procedures taken by the countries to limit the Corona virus, which are ranging between the contract's cancellation due to the majeure force or the contract rebalancing due to the emergency circumstances or considering the contract is valid and not affected by the procedures that have been taken.

Accordingly, the failure of one of the parties may lead to compensation for the damage to the other party.

Data Type

Conference Papers

Record ID

BIM-1267090

American Psychological Association (APA)

الزبيدي، محمد صديق محمد عبد الله والحنكاوي، أحمد عبد الله. 2020-02-28. آثار الفايروسات المعدية على العقود المدنية : فايروس كوفيد-19 أنموذجا-كورونا. . مج. 9، العدد الخاص ج. 2 (2020)، ص ص. 11-30.كركوك، العراق : جامعة كركوك، كلية القانون و العلوم السياسية،.
https://search.emarefa.net/detail/BIM-1267090

Modern Language Association (MLA)

الزبيدي، محمد صديق محمد عبد الله والحنكاوي، أحمد عبد الله. آثار الفايروسات المعدية على العقود المدنية : فايروس كوفيد-19 أنموذجا-كورونا. . كركوك، العراق : جامعة كركوك، كلية القانون و العلوم السياسية،. 2020-02-28.
https://search.emarefa.net/detail/BIM-1267090

American Medical Association (AMA)

الزبيدي، محمد صديق محمد عبد الله والحنكاوي، أحمد عبد الله. آثار الفايروسات المعدية على العقود المدنية : فايروس كوفيد-19 أنموذجا-كورونا. .
https://search.emarefa.net/detail/BIM-1267090