Electricity pricing production from combined power plant

Author

Hatem, Falah F.

Source

The Iraqi Journal for Mechanical and Materials Engineering

Issue

Vol. 10, Issue 2 (31 Aug. 2010), pp.245-250, 6 p.

Publisher

University of Babylon College of Engineering

Publication Date

2010-08-31

Country of Publication

Iraq

No. of Pages

6

Main Subjects

Mechanical Engineering

Topics

Abstract EN

The main goal of combination the power plant is to achieved high efficiency in addition to reduced the production cost of the unit power produced from the plant.

This work included the cost calculation of power unit which produced from a combined power plant and the comparison this cost with that power produced from gas turbine power plant, the results shows that the price of unit power which produced from combined plant is less when the annual operation hours is more than 600 hr.

This work shows also the effect of different parameter such as thermal efficiency, fuel price, and the operation years on the power unit price.

American Psychological Association (APA)

Hatem, Falah F.. 2010. Electricity pricing production from combined power plant. The Iraqi Journal for Mechanical and Materials Engineering،Vol. 10, no. 2, pp.245-250.
https://search.emarefa.net/detail/BIM-243178

Modern Language Association (MLA)

Hatem, Falah F.. Electricity pricing production from combined power plant. The Iraqi Journal for Mechanical and Materials Engineering Vol. 10, no. 2 (2010), pp.245-250.
https://search.emarefa.net/detail/BIM-243178

American Medical Association (AMA)

Hatem, Falah F.. Electricity pricing production from combined power plant. The Iraqi Journal for Mechanical and Materials Engineering. 2010. Vol. 10, no. 2, pp.245-250.
https://search.emarefa.net/detail/BIM-243178

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references : p. 247

Record ID

BIM-243178