Prefabricated bridge deck and superstructure systems for rapid bridge replacement
Joint Authors
Yahya, Sharif
Abu Diyah, Usamah
Zalt, Ammar
Bayha, John
Source
Housing and Building National Research Center Journal
Issue
Vol. 3, Issue 2 (31 Aug. 2007), pp.42-53, 12 p.
Publisher
Housing and Building National Research Center
Publication Date
2007-08-31
Country of Publication
Egypt
No. of Pages
12
Main Subjects
Topics
Abstract EN
The condition of the interstate bridge network in the United States is deteriorating as the interstate highway system approaches the end of its service life.
Out of the 594,000 bridges nationwide, almost 135,000 are structurally deficient or functionally obsolete, and an additional 3,000 bridges are added to this classification each year.
For this reason the demand for bridge repair and replacement is at an all time high and at the same time lengthy construction time and traffic congestion associated with bridge work have become unacceptable to the traveling public.
In an effort to remedy lengthy construction of an interstate bridge, the American Association of State Highway Transportation Officials (AASHTO) has partnered with the Federal Highway Administration (FHWA) to develop a system whereby prefabricated bridge elements can be utilized in an easily implemented ‘Rapid Bridge Construction’ (RBC) method.
This paper will highlight the currently used methods of RBC and will present case studies of several bridges that are in service.
American Psychological Association (APA)
Yahya, Sharif& Abu Diyah, Usamah& Zalt, Ammar& Bayha, John. 2007. Prefabricated bridge deck and superstructure systems for rapid bridge replacement. Housing and Building National Research Center Journal،Vol. 3, no. 2, pp.42-53.
https://search.emarefa.net/detail/BIM-33425
Modern Language Association (MLA)
Yahya, Sharif…[et al.]. Prefabricated bridge deck and superstructure systems for rapid bridge replacement. Housing and Building National Research Center Journal Vol. 3, no. 2 (Aug. 2007), pp.42-53.
https://search.emarefa.net/detail/BIM-33425
American Medical Association (AMA)
Yahya, Sharif& Abu Diyah, Usamah& Zalt, Ammar& Bayha, John. Prefabricated bridge deck and superstructure systems for rapid bridge replacement. Housing and Building National Research Center Journal. 2007. Vol. 3, no. 2, pp.42-53.
https://search.emarefa.net/detail/BIM-33425
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references : p. 52-53
Record ID
BIM-33425