Risk exposure of the parties to build-operate-transfer (BOT)‎ methods of procurement

Other Title(s)

حجم المخاطر على أطراف التقاعد في طريقة الإسناد : BOT (البناء-التشغيل-التحويل-نقل الملكية)‎

Author

Abbas, Nabil Muhammad Ali

Source

Journal of King Abdulaziz University : Environmental Design Science

Issue

Vol. 2, Issue 1 (31 Dec. 2004), pp.17-39, 23 p.

Publisher

King Abdulaziz University Scientific Publishing Center

Publication Date

2004-12-31

Country of Publication

Saudi Arabia

No. of Pages

23

Main Subjects

Law
Civil Engineering

Topics

Abstract AR

إن الطرق المختلفة لنظام البناء-التشغيل و التحويل و نقل الملكية (BOT) هي طرق فائقة التعقيد، و قد أظهرت مخاطر جديدة لم تكن معروفة سابقا في صناعة التشييد.

و لقد كشفت هذه الطريقة قي التعاقد و الإسناد لمشاريع البنية الأساسية طرقا جديدة عديدة لعلاقة المشاركة بين القطاعين العام و الخاص.

إن الأوجه المختلفة لنظام ال BOT مثل BOOT وBOO ...

الخ تختلف أساسا في آلية الملكية و حق الاستخدام و المسؤوليات.

إن المخاطر تختلف من مشروع لآخر، و من قطع خدمات لآخر، و من بلد مضيف لآخر.

إن التحدي ينبت من التغيرات المتعددة في المشروع و المدة الطويلة و تعرض المشروع للمخاطر الخارجية و تعدد أطراف المشروع بما فيهم الممولين و المشغلين.

إن الدولة المضيفة للمشروع على المنافع الاقتصادية و الاجتماعية بينما يركز القطاع الخاص على الفوائد المالية و بين هذين الطرفين تقع كل مخاطر المشروع.

لقد وجدت هذه الورقة أن المخاطر السياسية هي أصعب المخاطر تناولا مقارنة بالمخاطر المالية.

ستبحث هذه الورقة حجم المخاطر التي يتعرض لها الأطراف الثلاثة و هم المستثمرون و الممولون و الحكومات.

و تخلص الورقة إلى أن من أهم المعوقات في طريق استخدام هذا الأسلوب التمويلي هو ضعفا المعرفة و الخبرة فيه.

كما تصل إلى أن الخبرات في هذا المجال متناثرة في أبحاث الباحثين و من المفيد تجميع هذه الخبرات في قاعدة معرفية بهدف تحسين أداء المشروعات المستقبلية.

و هناك توصية بزيادة الشفافية في طرق الاختيار للمستثمرين في نظام ال BOT مما سينعكس إيجابيا على ثقة المستثمرين و الممولين في الجهة المتعاقدة على مشروعات البنية الأساسية.

Abstract EN

-The Build-Operate-Transfer (BOT) array of methods are extremely complex arrangements.

They pose risks not experienced previously in the construction industry.

They unveil several new parallel approaches to public-private partnership.

The different faces of BOT (such as BOOT, BOO, ....

etc.) mainly differ in the precise mechanisms of ownership, usage rights, and obligations.

Each host country, each infrastructural sector, and indeed each specific project has its own risk profile.

Challenges arise from the markedly increased project variables, much longer time horizons, greater vulnerability to external risks, and multiple project participants (including specialist financiers and operators), with multi-attribute success criteria.

The private sector pursues the financial benefit generated from the project, while the government is concerned with the socio-economic benefit.

At the same time, all the project risks are allocated between them.

This paper found that political risks were the most difficult to handle in comparison with financial risks.

Promoters, lenders and government risk exposures are discussed.

This paper concludes that the most important barrier or limitation faced by central and local agencies is “lack of knowledge of and experience in the BOT concept”.

Expert knowledge is scattered in papers by researchers, it is useful to solicit this expert knowledge, consolidate it, and code it into a knowledge base within an appropriate framework to improve future BOT procurement process.

An important recommendation is to increase transparency in the selection process.

American Psychological Association (APA)

Abbas, Nabil Muhammad Ali. 2004. Risk exposure of the parties to build-operate-transfer (BOT) methods of procurement. Journal of King Abdulaziz University : Environmental Design Science،Vol. 2, no. 1, pp.17-39.
https://search.emarefa.net/detail/BIM-360902

Modern Language Association (MLA)

Abbas, Nabil Muhammad Ali. Risk exposure of the parties to build-operate-transfer (BOT) methods of procurement. Journal of King Abdulaziz University : Environmental Design Science Vol. 2, no. 1 (Dec. 2004), pp.17-39.
https://search.emarefa.net/detail/BIM-360902

American Medical Association (AMA)

Abbas, Nabil Muhammad Ali. Risk exposure of the parties to build-operate-transfer (BOT) methods of procurement. Journal of King Abdulaziz University : Environmental Design Science. 2004. Vol. 2, no. 1, pp.17-39.
https://search.emarefa.net/detail/BIM-360902

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references : p. 37-38

Record ID

BIM-360902