Modeling of a two-stage merge production with buffer storage

Other Title(s)

النمذجة لعملية إنتاجية مكونة من مرحلتين تندمجان مع وجود مخزون

Author

Savsar, Muhammad Abd Allah

Source

Journal of King Abdulaziz University : Engineering Sciences

Issue

Vol. 4, Issue 1 (31 Dec. 1992), pp.67-81, 15 p.

Publisher

King Abdulaziz University Scientific Publishing Center

Publication Date

1992-12-31

Country of Publication

Saudi Arabia

No. of Pages

15

Main Subjects

Mechanical Engineering

Abstract EN

In this article, an automated production system with two unreliable stages and a buffer is considered where the first stage has two identical machines in parallel and the second stage has a single machine.

A stochastic model, which consists of a set of differential equations, is developed and solved by using a systematic matrix approach to determine line efficiency.

American Psychological Association (APA)

Savsar, Muhammad Abd Allah. 1992. Modeling of a two-stage merge production with buffer storage. Journal of King Abdulaziz University : Engineering Sciences،Vol. 4, no. 1, pp.67-81.
https://search.emarefa.net/detail/BIM-398544

Modern Language Association (MLA)

Savsar, Muhammad Abd Allah. Modeling of a two-stage merge production with buffer storage. Journal of King Abdulaziz University : Engineering Sciences Vol. 4, no. 1 ( 1992), pp.67-81.
https://search.emarefa.net/detail/BIM-398544

American Medical Association (AMA)

Savsar, Muhammad Abd Allah. Modeling of a two-stage merge production with buffer storage. Journal of King Abdulaziz University : Engineering Sciences. 1992. Vol. 4, no. 1, pp.67-81.
https://search.emarefa.net/detail/BIM-398544

Data Type

Journal Articles

Language

English

Notes

Includes appendix : p. 78-80

Record ID

BIM-398544