![](/images/graphics-bg.png)
UET flow shop scheduling with intree precedence constraints on two machines
Source
Issue
Vol. 1999, Issue ج2 6 (30 Nov. 1999), pp.285-297, 13 p.
Publisher
Annaba Badji Mokhtar University
Publication Date
1999-11-30
Country of Publication
Algeria
No. of Pages
13
Main Subjects
Engineering & Technology Sciences (Multidisciplinary)
American Psychological Association (APA)
Labehri, N.& Rebaine, D.. 1999. UET flow shop scheduling with intree precedence constraints on two machines. Synthèse،Vol. 1999, no. ج2 6, pp.285-297.
https://search.emarefa.net/detail/BIM-433017
Modern Language Association (MLA)
Labehri, N.& Rebaine, D.. UET flow shop scheduling with intree precedence constraints on two machines. Synthèse No. ج2 6 (Nov. 1999), pp.285-297.
https://search.emarefa.net/detail/BIM-433017
American Medical Association (AMA)
Labehri, N.& Rebaine, D.. UET flow shop scheduling with intree precedence constraints on two machines. Synthèse. 1999. Vol. 1999, no. ج2 6, pp.285-297.
https://search.emarefa.net/detail/BIM-433017
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references : p. 297
Record ID
BIM-433017