UET flow shop scheduling with intree precedence constraints on two machines

Source

Synthèse

Issue

Vol. 1999, Issue ج2 6 (30 Nov. 1999), pp.285-297, 13 p.

Publisher

Annaba Badji Mokhtar University

Publication Date

1999-11-30

Country of Publication

Algeria

No. of Pages

13

Main Subjects

Engineering & Technology Sciences (Multidisciplinary)

American Psychological Association (APA)

Labehri, N.& Rebaine, D.. 1999. UET flow shop scheduling with intree precedence constraints on two machines. Synthèse،Vol. 1999, no. ج2 6, pp.285-297.
https://search.emarefa.net/detail/BIM-433017

Modern Language Association (MLA)

Labehri, N.& Rebaine, D.. UET flow shop scheduling with intree precedence constraints on two machines. Synthèse No. ج2 6 (Nov. 1999), pp.285-297.
https://search.emarefa.net/detail/BIM-433017

American Medical Association (AMA)

Labehri, N.& Rebaine, D.. UET flow shop scheduling with intree precedence constraints on two machines. Synthèse. 1999. Vol. 1999, no. ج2 6, pp.285-297.
https://search.emarefa.net/detail/BIM-433017

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references : p. 297

Record ID

BIM-433017