Research on Construction Optimization of Three-Connected-Arch Hydraulic Underground Cavities Considering Creep Property

Joint Authors

Xu, Nian-chun
Zhao, Bao-yun
Wu, Tong-qing
Li, Zi-yun

Source

Mathematical Problems in Engineering

Issue

Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-11, 11 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2014-08-06

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Civil Engineering

Abstract EN

In order to prevent the creep of surrounding rock in long-term construction, with consideration of different construction methods and other factors during the construction of large-scale underground cavity, three different construction schemes are designed for specific projects and a nonlinear viscoelastic-plastic creep model which can describe rock accelerated creeping is introduced and applied to construction optimization calculation of the large-scale three-connected-arch hydraulic underground cavity through secondary development of FLAC3D.

The results show that the adoption of middle cavity construction method, the second construction method, enables the maximum vault displacement of 16.04 mm.

This method results in less stress redistribution and plastic zone expansion to the cavity’s surrounding rock than the other two schemes, which is the safest construction scheme.

The conclusion can provide essential reference and guidance to similar engineering for construction optimization.

American Psychological Association (APA)

Zhao, Bao-yun& Xu, Nian-chun& Li, Zi-yun& Wu, Tong-qing. 2014. Research on Construction Optimization of Three-Connected-Arch Hydraulic Underground Cavities Considering Creep Property. Mathematical Problems in Engineering،Vol. 2014, no. 2014, pp.1-11.
https://search.emarefa.net/detail/BIM-512161

Modern Language Association (MLA)

Zhao, Bao-yun…[et al.]. Research on Construction Optimization of Three-Connected-Arch Hydraulic Underground Cavities Considering Creep Property. Mathematical Problems in Engineering No. 2014 (2014), pp.1-11.
https://search.emarefa.net/detail/BIM-512161

American Medical Association (AMA)

Zhao, Bao-yun& Xu, Nian-chun& Li, Zi-yun& Wu, Tong-qing. Research on Construction Optimization of Three-Connected-Arch Hydraulic Underground Cavities Considering Creep Property. Mathematical Problems in Engineering. 2014. Vol. 2014, no. 2014, pp.1-11.
https://search.emarefa.net/detail/BIM-512161

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-512161