Increasing the loadability of power system through optimal placement of GUPFC using UDTPSO

Joint Authors

Suresh, Chintalapudi V.
Sivanagaraju, Sirigiri

Source

Journal of Electrical Systems

Issue

Vol. 11, Issue 1 (31 Mar. 2015), pp.61-75, 15 p.

Publisher

Piercing Star House

Publication Date

2015-03-31

Country of Publication

Algeria

No. of Pages

15

Main Subjects

Electronic engineering

Topics

Abstract EN

This paper concentrates on increasing the loadability of power system.

The most powerful multi-line FACTS controller, Generalized Unified Power Flow Controller (GUPFC) is considered using power injection model.

While finding the optimal installation location for GUPFC, transmission line thermal limits and bus voltage limits are taken into consideration.

The overall system and area wise loadability is enhanced in the presence of GUPFC with static and dynamic loads under normal and contingency conditions.

A novel optimization algorithm based on uniform distribution of control variables and two-stage initialization processes included in conventional Particle Swarm Optimization (PSO) to start the convergence of problem with good initial value and reaches best final value in less number of iterations.

The proposed methodology is tested on standard IEEE-30 bus test system and the obtained results are quite encouraging and will be useful for power system restructuring.

American Psychological Association (APA)

Suresh, Chintalapudi V.& Sivanagaraju, Sirigiri. 2015. Increasing the loadability of power system through optimal placement of GUPFC using UDTPSO. Journal of Electrical Systems،Vol. 11, no. 1, pp.61-75.
https://search.emarefa.net/detail/BIM-525283

Modern Language Association (MLA)

Suresh, Chintalapudi V.& Sivanagaraju, Sirigiri. Increasing the loadability of power system through optimal placement of GUPFC using UDTPSO. Journal of Electrical Systems Vol. 11, no. 1 (Mar. 2015), pp.61-75.
https://search.emarefa.net/detail/BIM-525283

American Medical Association (AMA)

Suresh, Chintalapudi V.& Sivanagaraju, Sirigiri. Increasing the loadability of power system through optimal placement of GUPFC using UDTPSO. Journal of Electrical Systems. 2015. Vol. 11, no. 1, pp.61-75.
https://search.emarefa.net/detail/BIM-525283

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references : p. 75

Record ID

BIM-525283