Cost minimization model for construction equipment replacement policy
Dissertant
Thesis advisor
Comitee Members
Hiyasat, Muhammad A. S.
Mahir, Rami A.
University
Isra University
Faculty
Faculty of Engineering
University Country
Jordan
Degree
Master
Degree Date
2013
English Abstract
Construction companies are heavily dependent on their heavy construction equipment fleets.
These equipment fleets represent large capital investment by companies.
Equipment managers must make complex decisions on their deployment, maintenance and retirement.
They have finite physical and economic life and require replacement at some stage.
However, different methodologies are employed in determining the time of construction equipment replacement.
Among these decisions making approaches are optimization models.
Which are relatively recent, and still need more researches to enhance them.
This thesis investigates the mechanics of one of the most widely used replacement analysis theories, and how it can be implemented into a practical easy to use mathematical optimization model.
Also, in this thesis, a Matlab code that can be used as a decision making aid tool was developed.
Main Subjects
Topics
No. of Pages
56
Table of Contents
Table of contents.
Abstract.
Chapter One : Introduction.
Chapter Two : Literature review (economic assessment of construction equipment).
Chapter Three : Development of the mathematical replacement model.
Chapter Four : Conclusion and suggestions.
References.
American Psychological Association (APA)
al-Sadi, Anas Ahmad. (2013). Cost minimization model for construction equipment replacement policy. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-546122
Modern Language Association (MLA)
al-Sadi, Anas Ahmad. Cost minimization model for construction equipment replacement policy. (Master's theses Theses and Dissertations Master). Isra University. (2013).
https://search.emarefa.net/detail/BIM-546122
American Medical Association (AMA)
al-Sadi, Anas Ahmad. (2013). Cost minimization model for construction equipment replacement policy. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-546122
Language
English
Data Type
Arab Theses
Record ID
BIM-546122