Development of integrated strategy for managing construction sector in Iraq : project management maturity models
Joint Authors
Muhammad, Ibrahim Abd
al-Zuwayni, Fayiq M. Sarhan
Rahim, Saja H.
Source
Engineering and Technology Journal
Issue
Vol. 34, Issue 6A (30 Jun. 2016), pp.1131-1141, 11 p.
Publisher
Publication Date
2016-06-30
Country of Publication
Iraq
No. of Pages
11
Main Subjects
Business Administration
Civil Engineering
Topics
Abstract EN
A lot of construction projects fail to complete their processes according plans, leading to financial and technical problems.
The paper tries to study the extent to which the application of best management practices will have a quantitative measurable effect on project success.
The researcher developed a model to assess project management maturity for a sample study of the Iraqi ministry of construction and housing and public municipalities, then applied regression analysis to find the correlation of the maturity level of the cost, time management and the average project management processes maturity level and also deviation coefficient during the year (2007-2014).
American Psychological Association (APA)
Muhammad, Ibrahim Abd& al-Zuwayni, Fayiq M. Sarhan& Rahim, Saja H.. 2016. Development of integrated strategy for managing construction sector in Iraq : project management maturity models. Engineering and Technology Journal،Vol. 34, no. 6A, pp.1131-1141.
https://search.emarefa.net/detail/BIM-696791
Modern Language Association (MLA)
Muhammad, Ibrahim Abd…[et al.]. Development of integrated strategy for managing construction sector in Iraq : project management maturity models. Engineering and Technology Journal Vol. 34, no. 6A (2016), pp.1131-1141.
https://search.emarefa.net/detail/BIM-696791
American Medical Association (AMA)
Muhammad, Ibrahim Abd& al-Zuwayni, Fayiq M. Sarhan& Rahim, Saja H.. Development of integrated strategy for managing construction sector in Iraq : project management maturity models. Engineering and Technology Journal. 2016. Vol. 34, no. 6A, pp.1131-1141.
https://search.emarefa.net/detail/BIM-696791
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references : p. 1141
Record ID
BIM-696791