إدارة مخاطر مرحلة التشييد لمشاريع التشييد في سورية
Other Title(s)
Risk management of the construction stage for the construction projects in Syria
Joint Authors
منى حمادة
عامودي، عمر
نايفة، محمد
Source
مجلة جامعة دمشق للعلوم الهندسية
Issue
Vol. 28, Issue 1 (30 Jun. 2012), pp.129-153, 25 p.
Publisher
Publication Date
2012-06-30
Country of Publication
Syria
No. of Pages
25
Main Subjects
Abstract EN
Construction projects are subject to risks and uncertainties which affect project targets (cost, time, quality and safety).
This paper reviews risks and their effects on construction projects in Syria, and it aims to develop risk management framework.
In this work, risks in construction projects have been defined based on the literature review and interviews of some experts in the construction field.
A questionnaire was designed to define the probability of risk occurrence and their effects, also to define the level of their effects by multiplying the probability occurrence with the effects.
Another questionnaire was designed to define the extent of the effects of the most important risks on each target of the project, and to specify the procedures applied as a response to the risks.
The results of this research revealed that "the Inflation, price changes" and "the difference between contracted quantities and actual quantities " are seen as the most important risk, where the studied risks in this work affect the schedule more than any other project targets.
Also the results showed that avoiding the risks at the construction stage is the most used action.
American Psychological Association (APA)
منى حمادة ونايفة، محمد وعامودي، عمر. 2012. إدارة مخاطر مرحلة التشييد لمشاريع التشييد في سورية. مجلة جامعة دمشق للعلوم الهندسية،مج. 28، ع. 1، ص ص. 129-153.
https://search.emarefa.net/detail/BIM-751960
Modern Language Association (MLA)
منى حمادة....[و آخرون]. إدارة مخاطر مرحلة التشييد لمشاريع التشييد في سورية. مجلة جامعة دمشق للعلوم الهندسية مج. 28، ع. 1 (2012)، ص ص. 129-153.
https://search.emarefa.net/detail/BIM-751960
American Medical Association (AMA)
منى حمادة ونايفة، محمد وعامودي، عمر. إدارة مخاطر مرحلة التشييد لمشاريع التشييد في سورية. مجلة جامعة دمشق للعلوم الهندسية. 2012. مج. 28، ع. 1، ص ص. 129-153.
https://search.emarefa.net/detail/BIM-751960
Data Type
Journal Articles
Language
Arabic
Notes
يتضمن مراجع ببليوجرافية : ص. 149-152
Record ID
BIM-751960