إدارة مخاطر مرحلة التشييد لمشاريع التشييد في سورية

Other Title(s)

Risk management of the construction stage for the construction projects in Syria

Time cited in Arcif : 
3

Joint Authors

منى حمادة
عامودي، عمر
نايفة، محمد

Source

مجلة جامعة دمشق للعلوم الهندسية

Issue

Vol. 28, Issue 1 (30 Jun. 2012), pp.129-153, 25 p.

Publisher

Damascus University

Publication Date

2012-06-30

Country of Publication

Syria

No. of Pages

25

Main Subjects

Civil Engineering

Abstract EN

Construction projects are subject to risks and uncertainties which affect project targets (cost, time, quality and safety).

This paper reviews risks and their effects on construction projects in Syria, and it aims to develop risk management framework.

In this work, risks in construction projects have been defined based on the literature review and interviews of some experts in the construction field.

A questionnaire was designed to define the probability of risk occurrence and their effects, also to define the level of their effects by multiplying the probability occurrence with the effects.

Another questionnaire was designed to define the extent of the effects of the most important risks on each target of the project, and to specify the procedures applied as a response to the risks.

The results of this research revealed that "the Inflation, price changes" and "the difference between contracted quantities and actual quantities " are seen as the most important risk, where the studied risks in this work affect the schedule more than any other project targets.

Also the results showed that avoiding the risks at the construction stage is the most used action.

American Psychological Association (APA)

منى حمادة ونايفة، محمد وعامودي، عمر. 2012. إدارة مخاطر مرحلة التشييد لمشاريع التشييد في سورية. مجلة جامعة دمشق للعلوم الهندسية،مج. 28، ع. 1، ص ص. 129-153.
https://search.emarefa.net/detail/BIM-751960

Modern Language Association (MLA)

منى حمادة....[و آخرون]. إدارة مخاطر مرحلة التشييد لمشاريع التشييد في سورية. مجلة جامعة دمشق للعلوم الهندسية مج. 28، ع. 1 (2012)، ص ص. 129-153.
https://search.emarefa.net/detail/BIM-751960

American Medical Association (AMA)

منى حمادة ونايفة، محمد وعامودي، عمر. إدارة مخاطر مرحلة التشييد لمشاريع التشييد في سورية. مجلة جامعة دمشق للعلوم الهندسية. 2012. مج. 28، ع. 1، ص ص. 129-153.
https://search.emarefa.net/detail/BIM-751960

Data Type

Journal Articles

Language

Arabic

Notes

يتضمن مراجع ببليوجرافية : ص. 149-152

Record ID

BIM-751960