Solvable special cases for flow shop scheduling problem involving transportation time

Source

al-Mustansiriyah Journal of Science

Issue

Vol. 24, Issue 5 (31 Oct. 2013), pp.243-252, 10 p.

Publisher

al-Mustansyriah University College of Science

Publication Date

2013-10-31

Country of Publication

Iraq

No. of Pages

10

Main Subjects

Social Sciences (Multidisciplinary)

American Psychological Association (APA)

Ali, Niran Abbas. 2013. Solvable special cases for flow shop scheduling problem involving transportation time. al-Mustansiriyah Journal of Science،Vol. 24, no. 5, pp.243-252.
https://search.emarefa.net/detail/BIM-754067

Modern Language Association (MLA)

Ali, Niran Abbas. Solvable special cases for flow shop scheduling problem involving transportation time. al-Mustansiriyah Journal of Science Vol. 24, no. 5 (2013), pp.243-252.
https://search.emarefa.net/detail/BIM-754067

American Medical Association (AMA)

Ali, Niran Abbas. Solvable special cases for flow shop scheduling problem involving transportation time. al-Mustansiriyah Journal of Science. 2013. Vol. 24, no. 5, pp.243-252.
https://search.emarefa.net/detail/BIM-754067

Data Type

Journal Articles

Language

English

Notes

Record ID

BIM-754067