Identification and assessment of risk factors affecting construction projects

Joint Authors

Abd al-Karim, Muhammad Sayyid Basyuni Ahmad
al-Nawawi, Umar Ali Musa
Abd al-Alim, Ahmad Muhammad

Source

Housing and Building National Research Center Journal

Issue

Vol. 13, Issue 2 (31 Aug. 2017), pp.202-216, 15 p.

Publisher

Housing and Building National Research Center

Publication Date

2017-08-31

Country of Publication

Egypt

No. of Pages

15

Main Subjects

Civil Engineering

Abstract EN

Cost saving and time performance are usually essential to all parties who are involved in a construction project, that is owner, contractor, subcontractor.

The main causes of disputes in construction projects involve delay and failure to complete the work in the specified cost and time frame.

The delivery time of a project is a key factor to the owner in terms of cost as much as it is for the contractor.

Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc.

in which several types of risk factors may occur concurrently.

The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well.

Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis.

In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration.

As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency.

Data are collected from sixteen construction companies in Egypt.

The collected

American Psychological Association (APA)

Abd al-Karim, Muhammad Sayyid Basyuni Ahmad& al-Nawawi, Umar Ali Musa& Abd al-Alim, Ahmad Muhammad. 2017. Identification and assessment of risk factors affecting construction projects. Housing and Building National Research Center Journal،Vol. 13, no. 2, pp.202-216.
https://search.emarefa.net/detail/BIM-777453

Modern Language Association (MLA)

Abd al-Karim, Muhammad Sayyid Basyuni Ahmad…[et al.]. Identification and assessment of risk factors affecting construction projects. Housing and Building National Research Center Journal Vol. 13, no. 2 (Aug. 2017), pp.202-216.
https://search.emarefa.net/detail/BIM-777453

American Medical Association (AMA)

Abd al-Karim, Muhammad Sayyid Basyuni Ahmad& al-Nawawi, Umar Ali Musa& Abd al-Alim, Ahmad Muhammad. Identification and assessment of risk factors affecting construction projects. Housing and Building National Research Center Journal. 2017. Vol. 13, no. 2, pp.202-216.
https://search.emarefa.net/detail/BIM-777453

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references : p. 216

Record ID

BIM-777453