Building a management system to control the construction claims in Iraq

Other Title(s)

إعداد برنامج إدارة للسيطرة على التعويضات الحاصلة في مشاريع البناء في العراق

Author

Hadi, Inas Zaki

Source

al-Khwarizmi Engineering Journal

Issue

Vol. 14, Issue 1 (31 Mar. 2018), pp.108-117, 10 p.

Publisher

University of Baghdad al-Khwarizmi College of Engineering

Publication Date

2018-03-31

Country of Publication

Iraq

No. of Pages

10

Main Subjects

Civil Engineering

Abstract EN

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims.

Two parts have been done to achieve the research objective (theoretical part and practical part).

The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors.

The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main method which is used to resolve the claims in the construction project in Iraq.

Finally, the proposed claims management system is developed to control the causes of the claims during the preconstruction phase and construction phase.

American Psychological Association (APA)

Hadi, Inas Zaki. 2018. Building a management system to control the construction claims in Iraq. al-Khwarizmi Engineering Journal،Vol. 14, no. 1, pp.108-117.
https://search.emarefa.net/detail/BIM-835269

Modern Language Association (MLA)

Hadi, Inas Zaki. Building a management system to control the construction claims in Iraq. al-Khwarizmi Engineering Journal Vol. 14, no. 1 (Mar. 2018), pp.108-117.
https://search.emarefa.net/detail/BIM-835269

American Medical Association (AMA)

Hadi, Inas Zaki. Building a management system to control the construction claims in Iraq. al-Khwarizmi Engineering Journal. 2018. Vol. 14, no. 1, pp.108-117.
https://search.emarefa.net/detail/BIM-835269

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references : p. 116

Record ID

BIM-835269