The impact of incompetent contractor on the project schedule
Other Title(s)
تأثير المقاول غير الكفؤ على الجدول الزمني للمشروع
Author
Source
Journal of Engineering and Sustainable Development
Issue
Vol. 21, Issue 3 (31 May. 2017), pp.87-101, 15 p.
Publisher
al-Mustansyriah University College of Engineering
Publication Date
2017-05-31
Country of Publication
Iraq
No. of Pages
15
Main Subjects
American Psychological Association (APA)
al-Tamimi, Samiah Mahdi Hasan. 2017. The impact of incompetent contractor on the project schedule. Journal of Engineering and Sustainable Development،Vol. 21, no. 3, pp.87-101.
https://search.emarefa.net/detail/BIM-848989
Modern Language Association (MLA)
al-Tamimi, Samiah Mahdi Hasan. The impact of incompetent contractor on the project schedule. Journal of Engineering and Sustainable Development Vol. 21, no. 3 (May. 2017), pp.87-101.
https://search.emarefa.net/detail/BIM-848989
American Medical Association (AMA)
al-Tamimi, Samiah Mahdi Hasan. The impact of incompetent contractor on the project schedule. Journal of Engineering and Sustainable Development. 2017. Vol. 21, no. 3, pp.87-101.
https://search.emarefa.net/detail/BIM-848989
Data Type
Journal Articles
Language
English
Record ID
BIM-848989