The impact of incompetent contractor on the project schedule

Other Title(s)

تأثير المقاول غير الكفؤ على الجدول الزمني للمشروع

Author

al-Tamimi, Samiah Mahdi Hasan

Source

Journal of Engineering and Sustainable Development

Issue

Vol. 21, Issue 3 (31 May. 2017), pp.87-101, 15 p.

Publisher

al-Mustansyriah University College of Engineering

Publication Date

2017-05-31

Country of Publication

Iraq

No. of Pages

15

Main Subjects

Civil Engineering

American Psychological Association (APA)

al-Tamimi, Samiah Mahdi Hasan. 2017. The impact of incompetent contractor on the project schedule. Journal of Engineering and Sustainable Development،Vol. 21, no. 3, pp.87-101.
https://search.emarefa.net/detail/BIM-848989

Modern Language Association (MLA)

al-Tamimi, Samiah Mahdi Hasan. The impact of incompetent contractor on the project schedule. Journal of Engineering and Sustainable Development Vol. 21, no. 3 (May. 2017), pp.87-101.
https://search.emarefa.net/detail/BIM-848989

American Medical Association (AMA)

al-Tamimi, Samiah Mahdi Hasan. The impact of incompetent contractor on the project schedule. Journal of Engineering and Sustainable Development. 2017. Vol. 21, no. 3, pp.87-101.
https://search.emarefa.net/detail/BIM-848989

Data Type

Journal Articles

Language

English

Record ID

BIM-848989