تطوير خوارزمية جدولة الإنتاج لتطبيق نظام تخطيط الاحتياجات من المواد (MRP) في ظل قواعد نظرية القيود (TOC)
Joint Authors
Source
Issue
Vol. 7, Issue 2 (s) (30 Jun. 2017), pp.500-516, 17 p.
Publisher
Publication Date
2017-06-30
Country of Publication
Algeria
No. of Pages
17
Main Subjects
Economics & Business Administration
Abstract EN
this study aims to develop a production scheduling algorithm to applying material requirements system under theory of constraints rules for multi-stage assembly factory that has some bottleneck work centers at AMC enterprise.
The algorithm of proposed hybrid systemtries to load and schedule operations on bottleneck work centers in a manner that they are free of idle time and overtime.
The paper finds that the integrated approach that implements MRP under TOC rules is the best way to use and control the capacity and bottlenecks
American Psychological Association (APA)
أمغار، جمالي ومقري، زكية. 2017. تطوير خوارزمية جدولة الإنتاج لتطبيق نظام تخطيط الاحتياجات من المواد (MRP) في ظل قواعد نظرية القيود (TOC). مجلة الاقتصاد الصناعي،مج. 7، ع. 2 (s)، ص ص. 500-516.
https://search.emarefa.net/detail/BIM-863010
Modern Language Association (MLA)
أمغار، جمالي ومقري، زكية. تطوير خوارزمية جدولة الإنتاج لتطبيق نظام تخطيط الاحتياجات من المواد (MRP) في ظل قواعد نظرية القيود (TOC). مجلة الاقتصاد الصناعي مج. 7، ع. 2 (عدد خاص) (حزيران 2017)، ص ص. 500-516.
https://search.emarefa.net/detail/BIM-863010
American Medical Association (AMA)
أمغار، جمالي ومقري، زكية. تطوير خوارزمية جدولة الإنتاج لتطبيق نظام تخطيط الاحتياجات من المواد (MRP) في ظل قواعد نظرية القيود (TOC). مجلة الاقتصاد الصناعي. 2017. مج. 7، ع. 2 (s)، ص ص. 500-516.
https://search.emarefa.net/detail/BIM-863010
Data Type
Journal Articles
Language
Arabic
Notes
يتضمن هوامش : ص. 515-516
Record ID
BIM-863010