Evaluation of the project overhead costs in iraqi construction industry using fuzzy analytic hierarchy process (FAHP)‎

Other Title(s)

تقييم التكاليف الإدارية للمشروع في الصناعة الانشائية العراقية باستخدام عملية التحليل الهرمي الضبابية

Joint Authors

al-Zahiri, Salman Ahmad Muhammad
Rashid, Sawsan Muhammad

Source

Journal of Engineering

Issue

Vol. 24, Issue 11 (30 Nov. 2018), pp.68-83, 16 p.

Publisher

University of Baghdad College of Engineering

Publication Date

2018-11-30

Country of Publication

Iraq

No. of Pages

16

Main Subjects

Civil Engineering

Abstract EN

This research investigated the importance and priorities of the project overhead costs in Iraq via a questionnaire using the fuzzy analytic hierarchy process technique (FAHP).

Using this technique is very important in the uncertain circumstances as in our country.

The researcher reached to frame an equation through the results of the priorities of weights include the percentages of each of the main items of the project overhead costs.

The researcher tested this equation by applying it to one of the completed projects and the results showed suitability for the application.

The percentages of the (salaries, grants, and incentives) and (fieldwork requirements) in equation represent approximately two-thirds of project overhead costs.

So the contractors should deal with the project overhead costs carefully during estimate the bid.

Keywords: project Overhead, Costs, FAHP, Construction Industry

American Psychological Association (APA)

Rashid, Sawsan Muhammad& al-Zahiri, Salman Ahmad Muhammad. 2018. Evaluation of the project overhead costs in iraqi construction industry using fuzzy analytic hierarchy process (FAHP). Journal of Engineering،Vol. 24, no. 11, pp.68-83.
https://search.emarefa.net/detail/BIM-875552

Modern Language Association (MLA)

Rashid, Sawsan Muhammad& al-Zahiri, Salman Ahmad Muhammad. Evaluation of the project overhead costs in iraqi construction industry using fuzzy analytic hierarchy process (FAHP). Journal of Engineering Vol. 24, no. 11 (Nov. 2018), pp.68-83.
https://search.emarefa.net/detail/BIM-875552

American Medical Association (AMA)

Rashid, Sawsan Muhammad& al-Zahiri, Salman Ahmad Muhammad. Evaluation of the project overhead costs in iraqi construction industry using fuzzy analytic hierarchy process (FAHP). Journal of Engineering. 2018. Vol. 24, no. 11, pp.68-83.
https://search.emarefa.net/detail/BIM-875552

Data Type

Journal Articles

Language

English

Notes

Includes appendices : p. 76-83

Record ID

BIM-875552