![](/images/graphics-bg.png)
Conceptual framework of implementing strategic cost management and reducing costs through target costing system
Author
Source
Dirassat Journal Economic Issue
Issue
Vol. 5, Issue 1 (31 Jan. 2014), pp.3-16, 14 p.
Publisher
University of Laghouat Faculty of Economics Commercial and Management Sciences
Publication Date
2014-01-31
Country of Publication
Algeria
No. of Pages
14
Main Subjects
Abstract EN
Strategic cost management represents a respond to the need of organization to cope with changes in modern business environment.
Target costing is one of the most important strategic cost management tools, which enables through it organizations to adopt cost reducing strategy which is considered to be a strategic choice that can be implemented, in order to gain competitive advantages over rivals in the marketplace.
This paper research aims to identify the concept of target costing system along with its contribution in managing and reducing cost, as well as shed light on the basic pillars of strategic cost management and its importance in the current business environment.
American Psychological Association (APA)
Bu Arar, Ahmad Shams al-Din. 2014. Conceptual framework of implementing strategic cost management and reducing costs through target costing system. Dirassat Journal Economic Issue،Vol. 5, no. 1, pp.3-16.
https://search.emarefa.net/detail/BIM-904755
Modern Language Association (MLA)
Bu Arar, Ahmad Shams al-Din. Conceptual framework of implementing strategic cost management and reducing costs through target costing system. Dirassat Journal Economic Issue Vol. 5, no. 1 (Jan. 2014), pp.3-16.
https://search.emarefa.net/detail/BIM-904755
American Medical Association (AMA)
Bu Arar, Ahmad Shams al-Din. Conceptual framework of implementing strategic cost management and reducing costs through target costing system. Dirassat Journal Economic Issue. 2014. Vol. 5, no. 1, pp.3-16.
https://search.emarefa.net/detail/BIM-904755
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references : p. 15-16
Record ID
BIM-904755