Scheduling with Learning Effects andor Time-Dependent Processing Times to Minimize the Weighted Number of Tardy Jobs on a Single Machine

المؤلفون المشاركون

Qian, Jianbo
Steiner, George

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2013، العدد 2013 (31 ديسمبر/كانون الأول 2013)، ص ص. 1-9، 9ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2013-11-27

دولة النشر

مصر

عدد الصفحات

9

التخصصات الرئيسية

هندسة مدنية

الملخص EN

We consider single machine scheduling problems with learning/deterioration effects and time-dependent processing times, with due date assignment consideration, and our objective is to minimize the weighted number of tardy jobs.

By reducing all versions of the problem to an assignment problem, we solve them in O(n4) time.

For some important special cases, the time complexity can be improved to be O(n2) using dynamic programming techniques.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Qian, Jianbo& Steiner, George. 2013. Scheduling with Learning Effects andor Time-Dependent Processing Times to Minimize the Weighted Number of Tardy Jobs on a Single Machine. Mathematical Problems in Engineering،Vol. 2013, no. 2013, pp.1-9.
https://search.emarefa.net/detail/BIM-1011342

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Qian, Jianbo& Steiner, George. Scheduling with Learning Effects andor Time-Dependent Processing Times to Minimize the Weighted Number of Tardy Jobs on a Single Machine. Mathematical Problems in Engineering No. 2013 (2013), pp.1-9.
https://search.emarefa.net/detail/BIM-1011342

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Qian, Jianbo& Steiner, George. Scheduling with Learning Effects andor Time-Dependent Processing Times to Minimize the Weighted Number of Tardy Jobs on a Single Machine. Mathematical Problems in Engineering. 2013. Vol. 2013, no. 2013, pp.1-9.
https://search.emarefa.net/detail/BIM-1011342

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1011342