Scheduling with Learning Effects andor Time-Dependent Processing Times to Minimize the Weighted Number of Tardy Jobs on a Single Machine

Joint Authors

Qian, Jianbo
Steiner, George

Source

Mathematical Problems in Engineering

Issue

Vol. 2013, Issue 2013 (31 Dec. 2013), pp.1-9, 9 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2013-11-27

Country of Publication

Egypt

No. of Pages

9

Main Subjects

Civil Engineering

Abstract EN

We consider single machine scheduling problems with learning/deterioration effects and time-dependent processing times, with due date assignment consideration, and our objective is to minimize the weighted number of tardy jobs.

By reducing all versions of the problem to an assignment problem, we solve them in O(n4) time.

For some important special cases, the time complexity can be improved to be O(n2) using dynamic programming techniques.

American Psychological Association (APA)

Qian, Jianbo& Steiner, George. 2013. Scheduling with Learning Effects andor Time-Dependent Processing Times to Minimize the Weighted Number of Tardy Jobs on a Single Machine. Mathematical Problems in Engineering،Vol. 2013, no. 2013, pp.1-9.
https://search.emarefa.net/detail/BIM-1011342

Modern Language Association (MLA)

Qian, Jianbo& Steiner, George. Scheduling with Learning Effects andor Time-Dependent Processing Times to Minimize the Weighted Number of Tardy Jobs on a Single Machine. Mathematical Problems in Engineering No. 2013 (2013), pp.1-9.
https://search.emarefa.net/detail/BIM-1011342

American Medical Association (AMA)

Qian, Jianbo& Steiner, George. Scheduling with Learning Effects andor Time-Dependent Processing Times to Minimize the Weighted Number of Tardy Jobs on a Single Machine. Mathematical Problems in Engineering. 2013. Vol. 2013, no. 2013, pp.1-9.
https://search.emarefa.net/detail/BIM-1011342

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1011342