Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

المؤلفون المشاركون

Li, Ming
Wu, Guangdong

المصدر

Abstract and Applied Analysis

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-7، 7ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-08-04

دولة النشر

مصر

عدد الصفحات

7

التخصصات الرئيسية

الرياضيات

الملخص EN

Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management.

This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty.

Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed.

In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II) is modified to solve the project example.

The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Li, Ming& Wu, Guangdong. 2014. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects. Abstract and Applied Analysis،Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1015072

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Li, Ming& Wu, Guangdong. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects. Abstract and Applied Analysis No. 2014 (2014), pp.1-7.
https://search.emarefa.net/detail/BIM-1015072

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Li, Ming& Wu, Guangdong. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects. Abstract and Applied Analysis. 2014. Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1015072

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1015072