Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

Joint Authors

Li, Ming
Wu, Guangdong

Source

Abstract and Applied Analysis

Issue

Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-7, 7 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2014-08-04

Country of Publication

Egypt

No. of Pages

7

Main Subjects

Mathematics

Abstract EN

Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management.

This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty.

Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed.

In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II) is modified to solve the project example.

The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

American Psychological Association (APA)

Li, Ming& Wu, Guangdong. 2014. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects. Abstract and Applied Analysis،Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1015072

Modern Language Association (MLA)

Li, Ming& Wu, Guangdong. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects. Abstract and Applied Analysis No. 2014 (2014), pp.1-7.
https://search.emarefa.net/detail/BIM-1015072

American Medical Association (AMA)

Li, Ming& Wu, Guangdong. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects. Abstract and Applied Analysis. 2014. Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1015072

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1015072