A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations

المؤلفون المشاركون

Xiong, Jian
Xing, Li-ning
Yang, Ke-wei
Zhao, Qing-song
Chen, Ying-wu

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2012، العدد 2012 (31 ديسمبر/كانون الأول 2012)، ص ص. 1-24، 24ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2012-03-14

دولة النشر

مصر

عدد الصفحات

24

التخصصات الرئيسية

هندسة مدنية

الملخص EN

We study resource-constrained project scheduling problems withperturbation on activity durations.

With the consideration of robustnessand stability of a schedule, we model the problem as a multiobjective optimizationproblem.

Three objectives—makespan minimization, robustnessmaximization, and stability maximization—are simultaneously considered.

Wepropose a hybrid multiobjective evolutionary algorithm (H-MOEA) to solvethis problem.

In the process of the H-MOEA, the heuristic information isextracted periodically from the obtained nondominated solutions, and a localsearch procedure based on the accumulated information is incorporated.

Theresults obtained from the computational study show that the proposed approachis feasible and effective for the resource-constrained project schedulingproblems with stochastic durations.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Xiong, Jian& Chen, Ying-wu& Yang, Ke-wei& Zhao, Qing-song& Xing, Li-ning. 2012. A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations. Mathematical Problems in Engineering،Vol. 2012, no. 2012, pp.1-24.
https://search.emarefa.net/detail/BIM-1029756

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Xiong, Jian…[et al.]. A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations. Mathematical Problems in Engineering No. 2012 (2012), pp.1-24.
https://search.emarefa.net/detail/BIM-1029756

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Xiong, Jian& Chen, Ying-wu& Yang, Ke-wei& Zhao, Qing-song& Xing, Li-ning. A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations. Mathematical Problems in Engineering. 2012. Vol. 2012, no. 2012, pp.1-24.
https://search.emarefa.net/detail/BIM-1029756

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1029756