A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations
Joint Authors
Xiong, Jian
Xing, Li-ning
Yang, Ke-wei
Zhao, Qing-song
Chen, Ying-wu
Source
Mathematical Problems in Engineering
Issue
Vol. 2012, Issue 2012 (31 Dec. 2012), pp.1-24, 24 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2012-03-14
Country of Publication
Egypt
No. of Pages
24
Main Subjects
Abstract EN
We study resource-constrained project scheduling problems withperturbation on activity durations.
With the consideration of robustnessand stability of a schedule, we model the problem as a multiobjective optimizationproblem.
Three objectives—makespan minimization, robustnessmaximization, and stability maximization—are simultaneously considered.
Wepropose a hybrid multiobjective evolutionary algorithm (H-MOEA) to solvethis problem.
In the process of the H-MOEA, the heuristic information isextracted periodically from the obtained nondominated solutions, and a localsearch procedure based on the accumulated information is incorporated.
Theresults obtained from the computational study show that the proposed approachis feasible and effective for the resource-constrained project schedulingproblems with stochastic durations.
American Psychological Association (APA)
Xiong, Jian& Chen, Ying-wu& Yang, Ke-wei& Zhao, Qing-song& Xing, Li-ning. 2012. A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations. Mathematical Problems in Engineering،Vol. 2012, no. 2012, pp.1-24.
https://search.emarefa.net/detail/BIM-1029756
Modern Language Association (MLA)
Xiong, Jian…[et al.]. A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations. Mathematical Problems in Engineering No. 2012 (2012), pp.1-24.
https://search.emarefa.net/detail/BIM-1029756
American Medical Association (AMA)
Xiong, Jian& Chen, Ying-wu& Yang, Ke-wei& Zhao, Qing-song& Xing, Li-ning. A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations. Mathematical Problems in Engineering. 2012. Vol. 2012, no. 2012, pp.1-24.
https://search.emarefa.net/detail/BIM-1029756
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-1029756