Upper Bound Solution for the Face Stability of Shield Tunnel below the Water Table

المؤلفون المشاركون

Lu, Xilin
Wang, Haoran
Huang, Maosong

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-11، 11ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-10-09

دولة النشر

مصر

عدد الصفحات

11

التخصصات الرئيسية

هندسة مدنية

الملخص EN

By FE simulation with Mohr-Coulomb perfect elastoplasticity model, the relationship between the support pressure and displacement of the shield tunnel face was obtained.

According to the plastic strain distribution at collapse state, an appropriate failure mechanism was proposed for upper bound limit analysis, and the formula to calculate the limit support pressure was deduced.

The limit support pressure was rearranged to be the summation of soil cohesion c, surcharge load q, and soil gravity γ multiplied by their corresponding coefficients Nc, Nq, and Nγ, and parametric studies were carried out on these coefficients.

In order to consider the influence of seepage on the face stability, the pore water pressure distribution and the seepage force on the tunnel face were obtained by FE simulation.

After adding the power of seepage force into the equation of the upper bound limit analysis, the total limit support pressure for stabilizing the tunnel face under seepage condition was obtained.

The total limit support pressure was shown to increase almost linearly with the water table.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Lu, Xilin& Wang, Haoran& Huang, Maosong. 2014. Upper Bound Solution for the Face Stability of Shield Tunnel below the Water Table. Mathematical Problems in Engineering،Vol. 2014, no. 2014, pp.1-11.
https://search.emarefa.net/detail/BIM-1046429

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Lu, Xilin…[et al.]. Upper Bound Solution for the Face Stability of Shield Tunnel below the Water Table. Mathematical Problems in Engineering No. 2014 (2014), pp.1-11.
https://search.emarefa.net/detail/BIM-1046429

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Lu, Xilin& Wang, Haoran& Huang, Maosong. Upper Bound Solution for the Face Stability of Shield Tunnel below the Water Table. Mathematical Problems in Engineering. 2014. Vol. 2014, no. 2014, pp.1-11.
https://search.emarefa.net/detail/BIM-1046429

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1046429