Upper Bound Solution for the Face Stability of Shield Tunnel below the Water Table

Joint Authors

Lu, Xilin
Wang, Haoran
Huang, Maosong

Source

Mathematical Problems in Engineering

Issue

Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-11, 11 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2014-10-09

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Civil Engineering

Abstract EN

By FE simulation with Mohr-Coulomb perfect elastoplasticity model, the relationship between the support pressure and displacement of the shield tunnel face was obtained.

According to the plastic strain distribution at collapse state, an appropriate failure mechanism was proposed for upper bound limit analysis, and the formula to calculate the limit support pressure was deduced.

The limit support pressure was rearranged to be the summation of soil cohesion c, surcharge load q, and soil gravity γ multiplied by their corresponding coefficients Nc, Nq, and Nγ, and parametric studies were carried out on these coefficients.

In order to consider the influence of seepage on the face stability, the pore water pressure distribution and the seepage force on the tunnel face were obtained by FE simulation.

After adding the power of seepage force into the equation of the upper bound limit analysis, the total limit support pressure for stabilizing the tunnel face under seepage condition was obtained.

The total limit support pressure was shown to increase almost linearly with the water table.

American Psychological Association (APA)

Lu, Xilin& Wang, Haoran& Huang, Maosong. 2014. Upper Bound Solution for the Face Stability of Shield Tunnel below the Water Table. Mathematical Problems in Engineering،Vol. 2014, no. 2014, pp.1-11.
https://search.emarefa.net/detail/BIM-1046429

Modern Language Association (MLA)

Lu, Xilin…[et al.]. Upper Bound Solution for the Face Stability of Shield Tunnel below the Water Table. Mathematical Problems in Engineering No. 2014 (2014), pp.1-11.
https://search.emarefa.net/detail/BIM-1046429

American Medical Association (AMA)

Lu, Xilin& Wang, Haoran& Huang, Maosong. Upper Bound Solution for the Face Stability of Shield Tunnel below the Water Table. Mathematical Problems in Engineering. 2014. Vol. 2014, no. 2014, pp.1-11.
https://search.emarefa.net/detail/BIM-1046429

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1046429