Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA)‎ Excavation Method: A Case Study of the Zhongjie Subway Station

المؤلفون المشاركون

Guan, Yong-ping
Zhao, Wen
Li, Shen-gang
Zhang, Guo-bin

المصدر

The Scientific World Journal

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-16، 16ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-04-09

دولة النشر

مصر

عدد الصفحات

16

التخصصات الرئيسية

الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب

الملخص EN

The design and construction of shallow-buried tunnels in densely populated urban areas involve many challenges.

The ground movements induced by tunneling effects pose potential risks to infrastructure such as surface buildings, pipelines, and roads.

In this paper, a case study of the Zhongjie subway station located in Shenyang, China, is examined to investigate the key construction techniques and the influence of the Pile-Beam-Arch (PBA) excavation method on the surrounding environment.

This case study discusses the primary risk factors affecting the environmental safety and summarizes the corresponding risk mitigation measures and key techniques for subway station construction using the PBA excavation method in a densely populated urban area.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Guan, Yong-ping& Zhao, Wen& Li, Shen-gang& Zhang, Guo-bin. 2014. Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-16.
https://search.emarefa.net/detail/BIM-1049025

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Guan, Yong-ping…[et al.]. Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station. The Scientific World Journal No. 2014 (2014), pp.1-16.
https://search.emarefa.net/detail/BIM-1049025

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Guan, Yong-ping& Zhao, Wen& Li, Shen-gang& Zhang, Guo-bin. Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-16.
https://search.emarefa.net/detail/BIM-1049025

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1049025