![](/images/graphics-bg.png)
Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station
Joint Authors
Guan, Yong-ping
Zhao, Wen
Li, Shen-gang
Zhang, Guo-bin
Source
Issue
Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-16, 16 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2014-04-09
Country of Publication
Egypt
No. of Pages
16
Main Subjects
Medicine
Information Technology and Computer Science
Abstract EN
The design and construction of shallow-buried tunnels in densely populated urban areas involve many challenges.
The ground movements induced by tunneling effects pose potential risks to infrastructure such as surface buildings, pipelines, and roads.
In this paper, a case study of the Zhongjie subway station located in Shenyang, China, is examined to investigate the key construction techniques and the influence of the Pile-Beam-Arch (PBA) excavation method on the surrounding environment.
This case study discusses the primary risk factors affecting the environmental safety and summarizes the corresponding risk mitigation measures and key techniques for subway station construction using the PBA excavation method in a densely populated urban area.
American Psychological Association (APA)
Guan, Yong-ping& Zhao, Wen& Li, Shen-gang& Zhang, Guo-bin. 2014. Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-16.
https://search.emarefa.net/detail/BIM-1049025
Modern Language Association (MLA)
Guan, Yong-ping…[et al.]. Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station. The Scientific World Journal No. 2014 (2014), pp.1-16.
https://search.emarefa.net/detail/BIM-1049025
American Medical Association (AMA)
Guan, Yong-ping& Zhao, Wen& Li, Shen-gang& Zhang, Guo-bin. Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-16.
https://search.emarefa.net/detail/BIM-1049025
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-1049025