Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project

المؤلفون المشاركون

Feng, Cuiying
Xu, Jiuping

المصدر

The Scientific World Journal

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-20، 20ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-01-15

دولة النشر

مصر

عدد الصفحات

20

التخصصات الرئيسية

الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب

الملخص EN

This paper presents an extension of the multimode resource-constrainedproject scheduling problem for a large scale construction project wheremultiple parallel projects and a fuzzy random environment are considered.

By taking into account the most typical goals in project management,a cost/weighted makespan/quality trade-off optimization model is constructed.

To deal with the uncertainties, a hybrid crisp approach is used to transform thefuzzy random parameters into fuzzy variables that are subsequently defuzzifiedusing an expected value operator with an optimistic-pessimistic index.

Then acombinatorial-priority-based hybrid particle swarm optimization algorithm is developedto solve the proposed model, where the combinatorial particle swarm optimization andpriority-based particle swarm optimization are designed to assign modes to activities and to scheduleactivities, respectively.

Finally, the results and analysis of a practicalexample at a large scale hydropower construction project are presented to demonstrate the practicalityand efficiency of the proposed model and optimization method.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Xu, Jiuping& Feng, Cuiying. 2014. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-20.
https://search.emarefa.net/detail/BIM-1049711

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Xu, Jiuping& Feng, Cuiying. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project. The Scientific World Journal No. 2014 (2014), pp.1-20.
https://search.emarefa.net/detail/BIM-1049711

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Xu, Jiuping& Feng, Cuiying. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-20.
https://search.emarefa.net/detail/BIM-1049711

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1049711