![](/images/graphics-bg.png)
Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project
المؤلفون المشاركون
المصدر
العدد
المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-20، 20ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2014-01-15
دولة النشر
مصر
عدد الصفحات
20
التخصصات الرئيسية
الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب
الملخص EN
This paper presents an extension of the multimode resource-constrainedproject scheduling problem for a large scale construction project wheremultiple parallel projects and a fuzzy random environment are considered.
By taking into account the most typical goals in project management,a cost/weighted makespan/quality trade-off optimization model is constructed.
To deal with the uncertainties, a hybrid crisp approach is used to transform thefuzzy random parameters into fuzzy variables that are subsequently defuzzifiedusing an expected value operator with an optimistic-pessimistic index.
Then acombinatorial-priority-based hybrid particle swarm optimization algorithm is developedto solve the proposed model, where the combinatorial particle swarm optimization andpriority-based particle swarm optimization are designed to assign modes to activities and to scheduleactivities, respectively.
Finally, the results and analysis of a practicalexample at a large scale hydropower construction project are presented to demonstrate the practicalityand efficiency of the proposed model and optimization method.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Xu, Jiuping& Feng, Cuiying. 2014. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-20.
https://search.emarefa.net/detail/BIM-1049711
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Xu, Jiuping& Feng, Cuiying. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project. The Scientific World Journal No. 2014 (2014), pp.1-20.
https://search.emarefa.net/detail/BIM-1049711
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Xu, Jiuping& Feng, Cuiying. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-20.
https://search.emarefa.net/detail/BIM-1049711
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1049711
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)