Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project

Joint Authors

Feng, Cuiying
Xu, Jiuping

Source

The Scientific World Journal

Issue

Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-20, 20 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2014-01-15

Country of Publication

Egypt

No. of Pages

20

Main Subjects

Medicine
Information Technology and Computer Science

Abstract EN

This paper presents an extension of the multimode resource-constrainedproject scheduling problem for a large scale construction project wheremultiple parallel projects and a fuzzy random environment are considered.

By taking into account the most typical goals in project management,a cost/weighted makespan/quality trade-off optimization model is constructed.

To deal with the uncertainties, a hybrid crisp approach is used to transform thefuzzy random parameters into fuzzy variables that are subsequently defuzzifiedusing an expected value operator with an optimistic-pessimistic index.

Then acombinatorial-priority-based hybrid particle swarm optimization algorithm is developedto solve the proposed model, where the combinatorial particle swarm optimization andpriority-based particle swarm optimization are designed to assign modes to activities and to scheduleactivities, respectively.

Finally, the results and analysis of a practicalexample at a large scale hydropower construction project are presented to demonstrate the practicalityand efficiency of the proposed model and optimization method.

American Psychological Association (APA)

Xu, Jiuping& Feng, Cuiying. 2014. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-20.
https://search.emarefa.net/detail/BIM-1049711

Modern Language Association (MLA)

Xu, Jiuping& Feng, Cuiying. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project. The Scientific World Journal No. 2014 (2014), pp.1-20.
https://search.emarefa.net/detail/BIM-1049711

American Medical Association (AMA)

Xu, Jiuping& Feng, Cuiying. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to aLarge Scale Hydropower Construction Project. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-20.
https://search.emarefa.net/detail/BIM-1049711

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1049711