An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation

المؤلفون المشاركون

He, Xinhua
Hu, Wenfa

المصدر

The Scientific World Journal

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-01-30

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب

الملخص EN

The time, quality, and cost are three important but contradictive objectives in a building construction project.

It is a tough challenge for project managers to optimize them since they are different parameters.

This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives.

The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration.

The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities.

A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems.

Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices.

The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Hu, Wenfa& He, Xinhua. 2014. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-1050561

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Hu, Wenfa& He, Xinhua. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation. The Scientific World Journal No. 2014 (2014), pp.1-10.
https://search.emarefa.net/detail/BIM-1050561

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Hu, Wenfa& He, Xinhua. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-1050561

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1050561