An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation
المؤلفون المشاركون
المصدر
العدد
المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-10، 10ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2014-01-30
دولة النشر
مصر
عدد الصفحات
10
التخصصات الرئيسية
الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب
الملخص EN
The time, quality, and cost are three important but contradictive objectives in a building construction project.
It is a tough challenge for project managers to optimize them since they are different parameters.
This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives.
The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration.
The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities.
A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems.
Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices.
The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Hu, Wenfa& He, Xinhua. 2014. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-1050561
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Hu, Wenfa& He, Xinhua. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation. The Scientific World Journal No. 2014 (2014), pp.1-10.
https://search.emarefa.net/detail/BIM-1050561
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Hu, Wenfa& He, Xinhua. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-1050561
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1050561
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر