An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation

Joint Authors

He, Xinhua
Hu, Wenfa

Source

The Scientific World Journal

Issue

Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-10, 10 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2014-01-30

Country of Publication

Egypt

No. of Pages

10

Main Subjects

Medicine
Information Technology and Computer Science

Abstract EN

The time, quality, and cost are three important but contradictive objectives in a building construction project.

It is a tough challenge for project managers to optimize them since they are different parameters.

This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives.

The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration.

The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities.

A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems.

Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices.

The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.

American Psychological Association (APA)

Hu, Wenfa& He, Xinhua. 2014. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-1050561

Modern Language Association (MLA)

Hu, Wenfa& He, Xinhua. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation. The Scientific World Journal No. 2014 (2014), pp.1-10.
https://search.emarefa.net/detail/BIM-1050561

American Medical Association (AMA)

Hu, Wenfa& He, Xinhua. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-1050561

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1050561