Scheduling Projects with Multiskill Learning Effect

المؤلفون المشاركون

Zha, Hong
Zhang, Lianying

المصدر

The Scientific World Journal

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-7، 7ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-02-10

دولة النشر

مصر

عدد الصفحات

7

التخصصات الرئيسية

الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب

الملخص EN

We investigate the project scheduling problem with multiskill learning effect.

A new model is proposed to deal with the problem, where both autonomous and induced learning are considered.

In order to obtain the optimal solution, a genetic algorithm with specific encoding and decoding schemes is introduced.

A numerical example is used to illustrate the proposed model.

The computational results show that the learning effect cannot be neglected in project scheduling.

By means of determining the level of induced learning, the project manager can balance the project makespan with total cost.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Zha, Hong& Zhang, Lianying. 2014. Scheduling Projects with Multiskill Learning Effect. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1050814

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Zha, Hong& Zhang, Lianying. Scheduling Projects with Multiskill Learning Effect. The Scientific World Journal No. 2014 (2014), pp.1-7.
https://search.emarefa.net/detail/BIM-1050814

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Zha, Hong& Zhang, Lianying. Scheduling Projects with Multiskill Learning Effect. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1050814

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1050814