Scheduling Projects with Multiskill Learning Effect

Joint Authors

Zha, Hong
Zhang, Lianying

Source

The Scientific World Journal

Issue

Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-7, 7 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2014-02-10

Country of Publication

Egypt

No. of Pages

7

Main Subjects

Medicine
Information Technology and Computer Science

Abstract EN

We investigate the project scheduling problem with multiskill learning effect.

A new model is proposed to deal with the problem, where both autonomous and induced learning are considered.

In order to obtain the optimal solution, a genetic algorithm with specific encoding and decoding schemes is introduced.

A numerical example is used to illustrate the proposed model.

The computational results show that the learning effect cannot be neglected in project scheduling.

By means of determining the level of induced learning, the project manager can balance the project makespan with total cost.

American Psychological Association (APA)

Zha, Hong& Zhang, Lianying. 2014. Scheduling Projects with Multiskill Learning Effect. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1050814

Modern Language Association (MLA)

Zha, Hong& Zhang, Lianying. Scheduling Projects with Multiskill Learning Effect. The Scientific World Journal No. 2014 (2014), pp.1-7.
https://search.emarefa.net/detail/BIM-1050814

American Medical Association (AMA)

Zha, Hong& Zhang, Lianying. Scheduling Projects with Multiskill Learning Effect. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1050814

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1050814