![](/images/graphics-bg.png)
Delay Analysis of Networked Control Systems Based on 100 M Switched Ethernet
المؤلف
المصدر
العدد
المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-7، 7ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2014-06-05
دولة النشر
مصر
عدد الصفحات
7
التخصصات الرئيسية
الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب
الملخص EN
For the delay may degrade the performance of networked control systems, networked control systems based on 100 M switched Ethernet are proposed in this paper.
According to the working principle of Ethernet switch, the formulas of the upper bound delay of the single-level switched Ethernet and the multiple-level switched Ethernet are deduced by the timing diagram method, and the values of the upper bound delay are also given.
The key factors that influence the upper bound delay of switched Ethernet are analyzed; then, the characteristics of the upper bound delay are presented, which show that the delay induced by the single-level 100 M switched Ethernet has little effect on the performance of control systems, while the delay induced by the multiple-level 100 M switched Ethernet may meet the time requirements of all classes of control systems if the numbers of levels and the numbers of nodes connecting to switches are set properly.
Finally, the performance of networked control systems is simulated by TrueTime, and the results further show the feasibility and superiority of 100 M switched Ethernet based networked control systems without modification of the network protocols.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Li, Ming. 2014. Delay Analysis of Networked Control Systems Based on 100 M Switched Ethernet. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1050905
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Li, Ming. Delay Analysis of Networked Control Systems Based on 100 M Switched Ethernet. The Scientific World Journal No. 2014 (2014), pp.1-7.
https://search.emarefa.net/detail/BIM-1050905
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Li, Ming. Delay Analysis of Networked Control Systems Based on 100 M Switched Ethernet. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1050905
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1050905
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)