![](/images/graphics-bg.png)
Delay Analysis of Networked Control Systems Based on 100 M Switched Ethernet
Author
Source
Issue
Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-7, 7 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2014-06-05
Country of Publication
Egypt
No. of Pages
7
Main Subjects
Medicine
Information Technology and Computer Science
Abstract EN
For the delay may degrade the performance of networked control systems, networked control systems based on 100 M switched Ethernet are proposed in this paper.
According to the working principle of Ethernet switch, the formulas of the upper bound delay of the single-level switched Ethernet and the multiple-level switched Ethernet are deduced by the timing diagram method, and the values of the upper bound delay are also given.
The key factors that influence the upper bound delay of switched Ethernet are analyzed; then, the characteristics of the upper bound delay are presented, which show that the delay induced by the single-level 100 M switched Ethernet has little effect on the performance of control systems, while the delay induced by the multiple-level 100 M switched Ethernet may meet the time requirements of all classes of control systems if the numbers of levels and the numbers of nodes connecting to switches are set properly.
Finally, the performance of networked control systems is simulated by TrueTime, and the results further show the feasibility and superiority of 100 M switched Ethernet based networked control systems without modification of the network protocols.
American Psychological Association (APA)
Li, Ming. 2014. Delay Analysis of Networked Control Systems Based on 100 M Switched Ethernet. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1050905
Modern Language Association (MLA)
Li, Ming. Delay Analysis of Networked Control Systems Based on 100 M Switched Ethernet. The Scientific World Journal No. 2014 (2014), pp.1-7.
https://search.emarefa.net/detail/BIM-1050905
American Medical Association (AMA)
Li, Ming. Delay Analysis of Networked Control Systems Based on 100 M Switched Ethernet. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1050905
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-1050905