Efficient Heuristic Algorithm for Scheduling Two-Stage Hybrid Flowshop with Sequence-Dependent Setup Times

المؤلفون المشاركون

Lee, Geun-Cheol
Hong, Jung Man
Choi, Seong-Hoon

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2015-07-27

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

هندسة مدنية

الملخص EN

We propose an efficient heuristic algorithm for two-stage hybrid flowshop scheduling with sequence-dependent setup times.

In the past, metaheuristic approaches, which usually need long time, have been mostly used for the problem.

In this study, due to practical reasons of the application that we consider, we need to obtain the solution of the problem within a reasonably short computational time, even for large-sized problems.

In this study, we devise the proposed algorithm as a hybrid of two methods, that is, the beam search and NEH method, and we compare the performances with other existing local search methods.

The results of the computational experiments show that the proposed algorithm solves the problems in a relatively shorter computation time, while the scheduling performances are superior to the existing methods.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Lee, Geun-Cheol& Hong, Jung Man& Choi, Seong-Hoon. 2015. Efficient Heuristic Algorithm for Scheduling Two-Stage Hybrid Flowshop with Sequence-Dependent Setup Times. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-10.
https://search.emarefa.net/detail/BIM-1073797

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Lee, Geun-Cheol…[et al.]. Efficient Heuristic Algorithm for Scheduling Two-Stage Hybrid Flowshop with Sequence-Dependent Setup Times. Mathematical Problems in Engineering No. 2015 (2015), pp.1-10.
https://search.emarefa.net/detail/BIM-1073797

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Lee, Geun-Cheol& Hong, Jung Man& Choi, Seong-Hoon. Efficient Heuristic Algorithm for Scheduling Two-Stage Hybrid Flowshop with Sequence-Dependent Setup Times. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-10.
https://search.emarefa.net/detail/BIM-1073797

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1073797