Efficient Heuristic Algorithm for Scheduling Two-Stage Hybrid Flowshop with Sequence-Dependent Setup Times

Joint Authors

Lee, Geun-Cheol
Hong, Jung Man
Choi, Seong-Hoon

Source

Mathematical Problems in Engineering

Issue

Vol. 2015, Issue 2015 (31 Dec. 2015), pp.1-10, 10 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2015-07-27

Country of Publication

Egypt

No. of Pages

10

Main Subjects

Civil Engineering

Abstract EN

We propose an efficient heuristic algorithm for two-stage hybrid flowshop scheduling with sequence-dependent setup times.

In the past, metaheuristic approaches, which usually need long time, have been mostly used for the problem.

In this study, due to practical reasons of the application that we consider, we need to obtain the solution of the problem within a reasonably short computational time, even for large-sized problems.

In this study, we devise the proposed algorithm as a hybrid of two methods, that is, the beam search and NEH method, and we compare the performances with other existing local search methods.

The results of the computational experiments show that the proposed algorithm solves the problems in a relatively shorter computation time, while the scheduling performances are superior to the existing methods.

American Psychological Association (APA)

Lee, Geun-Cheol& Hong, Jung Man& Choi, Seong-Hoon. 2015. Efficient Heuristic Algorithm for Scheduling Two-Stage Hybrid Flowshop with Sequence-Dependent Setup Times. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-10.
https://search.emarefa.net/detail/BIM-1073797

Modern Language Association (MLA)

Lee, Geun-Cheol…[et al.]. Efficient Heuristic Algorithm for Scheduling Two-Stage Hybrid Flowshop with Sequence-Dependent Setup Times. Mathematical Problems in Engineering No. 2015 (2015), pp.1-10.
https://search.emarefa.net/detail/BIM-1073797

American Medical Association (AMA)

Lee, Geun-Cheol& Hong, Jung Man& Choi, Seong-Hoon. Efficient Heuristic Algorithm for Scheduling Two-Stage Hybrid Flowshop with Sequence-Dependent Setup Times. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-10.
https://search.emarefa.net/detail/BIM-1073797

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1073797