الملخص EN
We consider the nonstandard parts supply chain with a public service platform for machinery integration in China.
The platform assigns orders placed by a machinery enterprise to multiple independent manufacturers who produce nonstandard parts and makes production schedule and batch delivery schedule for each manufacturer in a coordinate manner.
Each manufacturer has only one plant with parallel machines and is located at a location far away from other manufacturers.
Orders are first processed at the plants and then directly shipped from the plants to the enterprise in order to be finished before a given deadline.
We study the above integrated production-distribution scheduling problem with multiple manufacturers to maximize a weight sum of the profit of each manufacturer under the constraints that all orders are finished before the deadline and the profit of each manufacturer is not negative.
According to the optimal condition analysis, we formulate the problem as a mixed integer programming model and use CPLEX to solve it.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Hao, Jianhong& Cao, Lisi& Jiang, Dakui. 2015. Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-5.
https://search.emarefa.net/detail/BIM-1074184
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Hao, Jianhong…[et al.]. Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers. Mathematical Problems in Engineering No. 2015 (2015), pp.1-5.
https://search.emarefa.net/detail/BIM-1074184
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Hao, Jianhong& Cao, Lisi& Jiang, Dakui. Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-5.
https://search.emarefa.net/detail/BIM-1074184
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1074184
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر