Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers

المؤلفون المشاركون

Jiang, Dakui
Hao, Jianhong
Cao, Lisi

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-5، 5ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2015-07-16

دولة النشر

مصر

عدد الصفحات

5

التخصصات الرئيسية

هندسة مدنية

الملخص EN

We consider the nonstandard parts supply chain with a public service platform for machinery integration in China.

The platform assigns orders placed by a machinery enterprise to multiple independent manufacturers who produce nonstandard parts and makes production schedule and batch delivery schedule for each manufacturer in a coordinate manner.

Each manufacturer has only one plant with parallel machines and is located at a location far away from other manufacturers.

Orders are first processed at the plants and then directly shipped from the plants to the enterprise in order to be finished before a given deadline.

We study the above integrated production-distribution scheduling problem with multiple manufacturers to maximize a weight sum of the profit of each manufacturer under the constraints that all orders are finished before the deadline and the profit of each manufacturer is not negative.

According to the optimal condition analysis, we formulate the problem as a mixed integer programming model and use CPLEX to solve it.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Hao, Jianhong& Cao, Lisi& Jiang, Dakui. 2015. Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-5.
https://search.emarefa.net/detail/BIM-1074184

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Hao, Jianhong…[et al.]. Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers. Mathematical Problems in Engineering No. 2015 (2015), pp.1-5.
https://search.emarefa.net/detail/BIM-1074184

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Hao, Jianhong& Cao, Lisi& Jiang, Dakui. Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-5.
https://search.emarefa.net/detail/BIM-1074184

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1074184