Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers

Joint Authors

Jiang, Dakui
Hao, Jianhong
Cao, Lisi

Source

Mathematical Problems in Engineering

Issue

Vol. 2015, Issue 2015 (31 Dec. 2015), pp.1-5, 5 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2015-07-16

Country of Publication

Egypt

No. of Pages

5

Main Subjects

Civil Engineering

Abstract EN

We consider the nonstandard parts supply chain with a public service platform for machinery integration in China.

The platform assigns orders placed by a machinery enterprise to multiple independent manufacturers who produce nonstandard parts and makes production schedule and batch delivery schedule for each manufacturer in a coordinate manner.

Each manufacturer has only one plant with parallel machines and is located at a location far away from other manufacturers.

Orders are first processed at the plants and then directly shipped from the plants to the enterprise in order to be finished before a given deadline.

We study the above integrated production-distribution scheduling problem with multiple manufacturers to maximize a weight sum of the profit of each manufacturer under the constraints that all orders are finished before the deadline and the profit of each manufacturer is not negative.

According to the optimal condition analysis, we formulate the problem as a mixed integer programming model and use CPLEX to solve it.

American Psychological Association (APA)

Hao, Jianhong& Cao, Lisi& Jiang, Dakui. 2015. Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-5.
https://search.emarefa.net/detail/BIM-1074184

Modern Language Association (MLA)

Hao, Jianhong…[et al.]. Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers. Mathematical Problems in Engineering No. 2015 (2015), pp.1-5.
https://search.emarefa.net/detail/BIM-1074184

American Medical Association (AMA)

Hao, Jianhong& Cao, Lisi& Jiang, Dakui. Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-5.
https://search.emarefa.net/detail/BIM-1074184

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1074184