Sum-of-Processing-Times-Based Two-Agent Single-Machine Scheduling with Aging Effects and Tardiness

المؤلفون المشاركون

Kim, Do Gyun
Choi, Jin Young

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-12، 12ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2015-07-27

دولة النشر

مصر

عدد الصفحات

12

التخصصات الرئيسية

هندسة مدنية

الملخص EN

We consider a two-agent single-machine scheduling problem that minimizes the total weighted tardiness of one agent under the restriction that the second agent is prohibited from having tardy jobs.

The actual processing times of all jobs are affected by a sum-of-processing-times-based aging effect.

After showing the NP-hardness of the problem, we design a branch-and-bound (B&B) algorithm to find an optimal solution by developing dominance properties and a lower bound for the total weighted tardiness to increase search efficiency.

Because B&B takes a long time to find an optimal solution, we propose a genetic algorithm as an efficient, near optimal solution approach.

Four methods for generating initial populations are considered, and edge recombination crossover is adopted as a genetic operator.

Through numerical experiments, we verify the outstanding performance of the proposed genetic algorithm.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Kim, Do Gyun& Choi, Jin Young. 2015. Sum-of-Processing-Times-Based Two-Agent Single-Machine Scheduling with Aging Effects and Tardiness. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-12.
https://search.emarefa.net/detail/BIM-1074678

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Kim, Do Gyun& Choi, Jin Young. Sum-of-Processing-Times-Based Two-Agent Single-Machine Scheduling with Aging Effects and Tardiness. Mathematical Problems in Engineering No. 2015 (2015), pp.1-12.
https://search.emarefa.net/detail/BIM-1074678

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Kim, Do Gyun& Choi, Jin Young. Sum-of-Processing-Times-Based Two-Agent Single-Machine Scheduling with Aging Effects and Tardiness. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-12.
https://search.emarefa.net/detail/BIM-1074678

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1074678